全部科目 > 多媒体应用设计师 >
2011年上半年 上午试卷 综合知识
第 74 题
章/节 专业英语  
 
 
Ravi, like many project (71) , had studied the waterfall model of software development as the primary software life-cycle (72) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (75) to the new problem.
A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
 
  A.  parts
 
  B.  modules
 
  C.  software
 
  D.  a whole
 
 




 
 
相关试题     专业英语 

  第72题    2011年上半年  
Ravi, like many project (71) , had studied the waterfall model of software development as the primary software life-cycle (72) . He was all set to use it for an upcoming project, h..

  第73题    2020年下半年  
What is a Touch Screen?
A touch screen allows user commands to be issued by (71) corresponding buttons on the screen. Since their introduction in the 1970s, touch screens ha..

  第74题    2016年上半年  
Murphy’s Law suggests, “If anything can go wrong, it will.” Murphy has motivated numerous pearls of wisdom about projects, machines, people, and why things go wro..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有