Your project is behind schedule due to conflict between team members .Haring resolved the conflict, to get the project back on schedule,you should consider (74).
 
  A.  crashing the Schedule
 
  B.  performing resource leveling
 
  C.  conducting reverse resource allocation Scheduling
 
  D.  utilizing the critical chair resources
 
 




 
 
相关试题     专业英语 

  第71题    2013年下半年  
Each machine in the internet is assigned a unique network address,called(71),that is used to identify the machine for communication purposes.

  第74题    2013年上半年  
Software configuration management(SCM),is the task of tracking and controiling changes in the software,configuration management practices configuration identirication change contro..

  第72题    2015年上半年  
When multiple routers are used in interconnected networks,the routers exchange information about()using a dynamic routing protocol.




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有