2013年下半年 上午试卷 综合知识
第 72 题
章/节 专业英语  
 
 
Information,in its most restricted technical sense,is a seque of symbols that can be interpreted as a message.Information can be recorded as signs,or transmitted as(72).
 
  A.  symbols
 
  B.  message
 
  C.  signals
 
  D.  wave
 
 




 
 