Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  main symptom
 
  B.  root problem
 
  C.  final blueprint
 
  D.  data specification
 
 




 
 
相关试题     专业英语 

  第75题    2013年上半年  
(75)is responsible for the attraction,selection,training,assessment,and rewarding of comployers,while also overseeing organizational leadership and cuiture and ensuring complianc..

  第72题    2008年下半年  
Project work packages are typically decomposed into smaller componentscalled activities to provide a basis for (72), scheduling, executing, and monitoring and controlling the proje..

  第72题    2012年上半年  
The TCP protocol is a (72) layer protocol.




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有