2011年下半年 上午试卷 综合知识
第 71 题
章/节 专业英语  
 
 
The project manager must maintain an effective communication link with the customer’s satisfaction with the progress of the project. The project manager maintains this link through (71).
 
  A.  Periodic project reports, periodic visits to the customer, and telephonic exchanges
 
  B.  Subordinates, project team members, and the project sponsor
 
  C.  One-time reports, weekly reports, and monthly reports
 
  D.  The telephone, facsimile, and data transmission
 
 




 
 
相关试题     专业英语 

  第75题    2011年下半年  
The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the(75).

  第71题    2012年上半年  
A(71)is a dedicated storage network that provides access to consolidated,block level storage.It is primarily used to mark storage devices accessible to servers so that the devices ..

  第74题    2010年上半年  
(74) is primarily concerned with defining and controlling what is and is not included in the project.




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有