全部科目 > 系统集成项目管理工程师 >
2011年下半年 上午试卷 综合知识
第 73 题
章/节 专业英语  
 
 
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to(73).
 
  A.  Measure, delay, record, distribute , analyze, and direct
 
  B.  Plan, schedule, monitor, control, report, and forecast
 
  C.  Promote, highlight, monitor, control, forecast, and report
 
  D.  Emphasize, visualize, analyze, conceptualize, report and record
 
 




 
 
相关试题     专业英语 

  第75题    2021年下半年  
In china,the security protection level of information system vs olivided into()levels.

  第72题    2011年上半年  
Ethernet is the commonly used local area network communication protocol. The standard of Ethernet is (72).

  第72题    2018年上半年  
The IoT architecture can be divided into three layers. ( )is the key layer to realize the foundational capabilities which support the electronic devices interact with physical wo..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有