全部科目 > 系统分析师 >
2009年上半年 上午试卷 综合知识
第 72 题
章/节 专业英语  
 
 
Many of the activities performed during the preliminary investigation are still being conducted in (71).but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to. enable an effective solution to be proposed and implemented. Besides the(74)for process and data of current system,the deliverable from this phase also includes the(75)for the proposed system.
 
  A.  main symptom
 
  B.  root problem
 
  C.  final blueprint
 
  D.  data specification
 
 




 
 
相关试题     专业英语 

  第71题    2011年上半年  
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates a..

  第73题    2013年上半年  
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change after the initial problems and..

  第72题    2021年上半年  




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有