uring the systems planning phase, a systems analyst conducts a (71)activity to study the systems request and recommend specific action. After obtaining an authorization to proceed, the analyst interacts with (72) to gather facts about the problem or opportunity, project scope and constraints, project benefits, and estimated development time and costs. In many cases, the systems request does not reveal the underlying problem, but only a symptom. A popular technique for investigating causes and effects is called (73)The analyst has analyzed the problem or opportunity, defined the project scope and constraints, and performed (74)to evaluate project usability, costs, benefits, and time constraints. The end product of the activity is (75). The main content must include an estimate of time, staffing requirements, costs, benefits, and expected results for the next phase of the SDLC.
 
  A.  fishbone diagram
 
  B.  PERT diagram
 
  C.  Gantt diagram
 
  D.  use case diagram
 
 




 
 
相关试题     专业英语 

  第71题    2013年上半年  
Feasibility should be measured throughout the life cycle of system development. The scope and complexity of an apparently feasible project can change after the initial problems and..

  第73题    2020年下半年  
Unified Modeling Language (UML) is a widely used method of visualizing and documenting an information system. The UML can be used to develop (71) ,in which an object r..

  第74题    2014年上半年  
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs a..




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有