全部科目 > 信息系统监理师 >
2011年上半年 上午试卷 综合知识
第 75 题
章/节 专业英语  
 
 
Which statement about the preliminary design stage of a software development project is true? (75)。
 
  A.  The preliminary design is an internal document used only by programmers
 
  B.  The preliminary design is the result of mapping product requirements into software and hardware functions
 
  C.  The preliminary design of the product comes from the requirement specification
 
  D.  The developers produce the preliminary design by defining the software structure in enough detail to permit coding
 
 




 
 
相关试题     专业英语 

  第73题    2015年上半年  
(73)is the budgeted amount for the work actually completed on the schedule acticity or WBS comonent during a given period。

  第72题    2012年下半年  
Supervision will manage the implementation and the configuration of the different types of project documents, not including (72).

  第71题    2012年上半年  
Which is the second layer from the bottom in Open System Interconnection Reference Model? (71).




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有