2013年上半年 上午试卷 综合知识
第 74 题
章/节 专业英语  
 
 
Quality control is normally performed by the (74) .
 
  A.  QA personnel
 
  B.  project team
 
  C.  operating personnel
 
  D.  project manager
 
 




 
 
相关试题     专业英语 

  第73题    2019年下半年  
( )describes the configurable items of the project and identifies items that will be recorded and updated so that the product of the project remains consistent and operable.

  第75题    2011年下半年  
When a bridge transmits an Ethernet frame, the Ethernet frame has (75).

  第75题    2021年上半年  
()isafinancial analysis tool that used to determine the benefits provided by a project against its costs.