全部科目 > 信息系统监理师 >
2015年下半年 上午试卷 综合知识
第 74 题
章/节 专业英语  
 
 
During planning you sit down and estimate the time needed for each task and total them to come up with the project estimate. This duration is what you commit to complete the project. What is wrong with the scenario? ( ) .
 
  A.  The team did not create the estimate and estimating tales too long using that method
 
  B.  The team did not create the estimate and a network diagram was not used
 
  C.  The estimate is too long and should be created by management
 
  D.  The project estimate;should be the same as the customer's required completion date
 
 




 
 
相关试题     专业英语 

  第71题    2011年下半年  
The prototyping method is a dynamic design processes,which requires people who use prototyping method to have the following capability of (71) .

  第73题    2013年下半年  
Cost of quality is (73).

  第74题    2010年下半年  
Changes often happen in (74).




更多复习资料
请登录电脑版软考在线 www.rkpass.cn

京B2-20210865 | 京ICP备2020040059号-5
京公网安备 11010502032051号 | 营业执照
 Copyright ©2000-2023 All Rights Reserved
软考在线版权所有