免费智能真题库 > 软件评测师 > 分类
历年情况: 分类 专业英语
第5名 在分类(所有一级分类)中占分值排名
50 题 共考过题数
63% 错误率    难度系数
分类层级: 计算机系统构成及硬件基础知识
程序语言基础知识
操作系统基础知识
数据库系统
计算机网络基础知识
软件工程基础知识
软件构件与中间件
信息安全知识
软件的知识产权保护
专业英语
软件评测基础知识
测试用例设计方法
软件自动化测试
面向对象软件的测试
负载压力测试
Web应用测试
网络测试
安全测试
兼容性测试
易用性测试
文档测试
测试项目管理
多媒体基础知识
(一级分类)
 下载本试题列表   
所属试卷: 
   共50条     2/4页     上一页     下一页   
隶属试卷 题号 题干 难度系数/错误率 已做过 未做对
   2015年下半年
   软件评测师
   上午试卷 综合知识
第71题
选择题
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we need is something new that we have to learn.
But use cases do solve a problem with requirements: with (71) declarative requirements it's hard to describle steps and sequences of events.
Use cases, stated simply, allow description of sequences of events that, taken to..

82%
   2015年下半年
   软件评测师
   上午试卷 综合知识
第72题
选择题
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we need is something new that we have to learn.
But use cases do solve a problem with requirements: with (71) declarative requirements it's hard to describle steps and sequences of events.
Use cases, stated simply, allow description of sequences of events that, taken to..

61%
   2015年下半年
   软件评测师
   上午试卷 综合知识
第73题
选择题
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we need is something new that we have to learn.
But use cases do solve a problem with requirements: with (71) declarative requirements it's hard to describle steps and sequences of events.
Use cases, stated simply, allow description of sequences of events that, taken to..

69%
   2015年下半年
   软件评测师
   上午试卷 综合知识
第74题
选择题
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we need is something new that we have to learn.
But use cases do solve a problem with requirements: with (71) declarative requirements it's hard to describle steps and sequences of events.
Use cases, stated simply, allow description of sequences of events that, taken to..

68%
   2015年下半年
   软件评测师
   上午试卷 综合知识
第75题
选择题
In a world where it seems we already have too much to do, and too many things to think about, it seems the last thing we need is something new that we have to learn.
But use cases do solve a problem with requirements: with (71) declarative requirements it's hard to describle steps and sequences of events.
Use cases, stated simply, allow description of sequences of events that, taken to..

68%
   2014年下半年
   软件评测师
   上午试卷 综合知识
第71题
选择题
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and complexity of modem systems is such, and the demand for short schedules so great, that it is no longer (71 ) for one person to do most engineering jobs. Systems development is a team (72 ) , and the effectiveness of the team largely determines the (73..

61%
   2014年下半年
   软件评测师
   上午试卷 综合知识
第72题
选择题
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and complexity of modem systems is such, and the demand for short schedules so great, that it is no longer (71 ) for one person to do most engineering jobs. Systems development is a team (72 ) , and the effectiveness of the team largely determines the (73..

61%
   2014年下半年
   软件评测师
   上午试卷 综合知识
第73题
选择题
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and complexity of modem systems is such, and the demand for short schedules so great, that it is no longer (71 ) for one person to do most engineering jobs. Systems development is a team (72 ) , and the effectiveness of the team largely determines the (73..

46%
   2014年下半年
   软件评测师
   上午试卷 综合知识
第74题
选择题
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and complexity of modem systems is such, and the demand for short schedules so great, that it is no longer (71 ) for one person to do most engineering jobs. Systems development is a team (72 ) , and the effectiveness of the team largely determines the (73..

59%
   2014年下半年
   软件评测师
   上午试卷 综合知识
第75题
选择题
Teams are required for most engineering projects. Although some small hardware or software products can be developed by individuals, the scale and complexity of modem systems is such, and the demand for short schedules so great, that it is no longer (71 ) for one person to do most engineering jobs. Systems development is a team (72 ) , and the effectiveness of the team largely determines the (73..

65%
   2013年下半年
   软件评测师
   上午试卷 综合知识
第71题
选择题
There is nothing in this world constant but inconstancy. —SWIFT
Project after project designs a set of algorithms and then plunges into cor struction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects, the first system built is (71) usable. It may be too slow, too big, awkward to use, or all three. There is no (72) but to..

65%
   2013年下半年
   软件评测师
   上午试卷 综合知识
第72题
选择题
There is nothing in this world constant but inconstancy. —SWIFT
Project after project designs a set of algorithms and then plunges into cor struction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects, the first system built is (71) usable. It may be too slow, too big, awkward to use, or all three. There is no (72) but to..

62%
   2013年下半年
   软件评测师
   上午试卷 综合知识
第73题
选择题
There is nothing in this world constant but inconstancy. —SWIFT
Project after project designs a set of algorithms and then plunges into cor struction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects, the first system built is (71) usable. It may be too slow, too big, awkward to use, or all three. There is no (72) but to..

63%
   2013年下半年
   软件评测师
   上午试卷 综合知识
第74题
选择题
There is nothing in this world constant but inconstancy. —SWIFT
Project after project designs a set of algorithms and then plunges into cor struction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects, the first system built is (71) usable. It may be too slow, too big, awkward to use, or all three. There is no (72) but to..

71%
   2013年下半年
   软件评测师
   上午试卷 综合知识
第75题
选择题
There is nothing in this world constant but inconstancy. —SWIFT
Project after project designs a set of algorithms and then plunges into cor struction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects, the first system built is (71) usable. It may be too slow, too big, awkward to use, or all three. There is no (72) but to..

68%


 下载本试题列表   
  示例说明:   选择     案例     论文        共50条     2/4页     上一页     下一页   




本网站所有产品设计(包括造型,颜色,图案,观感,文字,产品,内容),功能及其展示形式,均已受版权或产权保护。
任何公司及个人不得以任何方式复制部分或全部,违者将依法追究责任,特此声明。
本站部分内容来自互联网或由会员上传,版权归原作者所有。如有问题,请及时联系我们。


工作时间:9:00-20:00

客服

点击这里给我发消息 点击这里给我发消息 点击这里给我发消息

商务合作

点击这里给我发消息

客服邮箱service@rkpass.cn


京B2-20210865 | 京ICP备2020040059号-5 |京公网安备 11010502032051号 | 营业执照 | Copyright ©2000-2023 All Rights Reserved 软考在线版权所有