隶属试卷 题号 题干 难度系数/错误率
   2023年下半年
   信息系统项目管..
   上午试卷 综合知识
第22题
选择题
 ()is the hierarchical breakdown of the entire scope of work by the project team to accomplish the project objectives and create the required deliverables,It provides detailed deliverable,activity,and scheduling information about each component in the work breakdown structure.

100%
   2022年上半年
   信息系统项目管..
   上午试卷 综合知识
第72题
选择题
()is a grid that shows the project resources assigned to each work package.

81%
   2020年下半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。

60%
   2019年上半年
   信息系统项目管..
   上午试卷 综合知识
第59题
选择题
下表给出了某项目到2018年12月30日为止的部分成本执行(绩效)数据。如果当前的成本偏差是非典型的,则完工估算(EAC)( )元。

42%
   2017年下半年
   信息系统项目管..
   上午试卷 综合知识
第58题
选择题
某系统集成项目包含了三个软件模块,现在估算项目成本时,项目经理考虑到其中的模块A技术成熟,已在以前类似项目中多次使用并成功支付,所以项目经理忽略了A的开发成本,只给A预留了5万元,以防意外发生。然后估算了B的成本为50万元,C成本为30万元,应急储备为10万元,三者集成成本为5万元,并预留了项目的10万元管理储备。如果你是项目组成员,该项目的成本基准是(58)万元,项目预算是(59)万元。项目开始执行后,当项目的进度..

46%
   2015年上半年
   信息系统项目管..
   上午试卷 综合知识
第73题
选择题
Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resource.

49%
   2014年下半年
   信息系统项目管..
   上午试卷 综合知识
第74题
选择题
In the (74)phase team members begin to work together and adjust their work habits and behaviors to support the team. The team learns to trust each other.

71%
   2013年下半年
   信息系统项目管..
   上午试卷 综合知识
第71题
选择题
Each machine in the internet is assigned a unique network address,called(71),that is used to identify the machine for communication purposes.

54%
   2009年下半年
   信息系统项目管..
   上午试卷 综合知识
第74题
选择题
The Unified Modeling Language is a standard graphical language for modeling object-oriented software.(74)can show the behavior of systems in terms of how objects interact with each other.

71%
   2008年上半年
   信息系统项目管..
   上午试卷 综合知识
第75题
选择题
Durin the project, requirements chan e for a variety of reasons. As needs chan e and as work proceeds, additional requirements are derived and chan es may have to be made to the existin requirements. It is essential to mana e these additions and chan es efficiently andeffectively. To effectively analyze the impact of the chan es, it is necessary that the source of each requirement is known and the..

69%
   2008年上半年
   信息系统项目管..
   上午试卷 综合知识
第74题
选择题
The receivin activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understandin is reached on the meanin of the requirements. The resultof this analysis and dialo is an (74)set of requirements.

71%
  示例说明:   选择     案例     论文        共11条     1/1页     上一页     下一页   




本网站所有产品设计(包括造型,颜色,图案,观感,文字,产品,内容),功能及其展示形式,均已受版权或产权保护。
任何公司及个人不得以任何方式复制部分或全部,违者将依法追究责任,特此声明。
本站部分内容来自互联网或由会员上传,版权归原作者所有。如有问题,请及时联系我们。


工作时间:9:00-20:00

客服

点击这里给我发消息 点击这里给我发消息 点击这里给我发消息

商务合作

点击这里给我发消息

客服邮箱service@rkpass.cn


京B2-20210865 | 京ICP备2020040059号-5 |京公网安备 11010502032051号 | 营业执照 | Copyright ©2000-2023 All Rights Reserved 软考在线版权所有