免费智能真题库 > 历年试卷 > 信息系统项目管理师 > 2009年上半年 信息系统项目管理师 上午试卷 综合知识
  第71题      
  章/节:   专业英语       

 
Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  analysis phase
 
  B.  design phase
 
  C.  implementation phase
 
  D.  maintenance phase
 
 
 

 
  第75题    2009年下半年  
   50%
The creation of a work breakdown structure(WBS)is the process of(75)the major project deliverables.
  第73题    2018年上半年  
   40%
( )includes the processes required to ensure that the project includes all the work required , and only the work requi..
  第73题    2019年上半年  
   48%
( ) are those costs that cannot be directly traced to a specific project and therefore will be accumulated and allocalte..
   题号导航      2009年上半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第71题    在手机中做本题