Many of the activities performed during the preliminary investigation are still being conducted in(71), but in much greater depth than before. During this phase, the analyst must become fully aware of the(72)and must develop enough knowledge about the(73)and the existing systems to enable an effective solution to be proposed and implemented.  Besides the(74)for process and data of current system, the deliverable from this phase also includes the(75)for the proposed system.
 
 
  A.  hardware and software specification
 
  B.  system performance specification
 
  C.  formal requirements definition
 
  D.  general problem statement
 
 
 

 
  第71题    2015年下半年  
   43%
In an Information system. The(71)is the bridge between hardware and people。
  第74题    2016年上半年  
   56%
(74) is one of the tools and techniques of Sequence Activities
  第72题    2021年下半年  
   46%
()is a decentralized database, ensure that the data will not be tampered with and forged。
   题号导航      2009年上半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第75题    在手机中做本题