The (73) process differs from the (74) process in that the former is primarily concerned with acceptance of the deliverables, while the latter is primarily concerned with correctness of the deliverables.
 
 
  A.  Perform Quality Assurance
 
  B.  Validate Scope
 
  C.  Control Quality
 
  D.  Define Scope
 
 
 

 
  第74题    2013年上半年  
   65%
Software configuration management(SCM),is the task of tracking and controiling changes in the software,configuration man..
  第71题    2012年上半年  
   46%
The connection between two networks to from an Internet is handled by a machine known as a(71).
  第72题    2010年下半年  
   81%
Many useful tools and techniques are used in developing schedule. (72) is a schedule network analysis technique that mo..
   题号导航      2018年下半年 信息系统项目管理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题