  章/节:   专业英语       

 
When required,the Perform Integrated Change Control process includes a ( ),Which is a formally chartered group responsible for reviewing,evaluating,approving, deferring, or rejecting changes to the project and for recording and communicating such decisions.
 
 
  A.  BBC
 
  B.  CCB
 
  C.  BCB
 
  D.  CBC
 
 
 

 
  第72题    2013年上半年  
   68%
TCP/IP is a communication protocol, which provides many different networking services. The TCP/IP Internet protocol suit..
  第74题    2019年上半年  
   65%
The perform Integrated Change Contorl process is the ultimate responsibility of the (73).Although changes may be initi..
  第73题    2017年上半年  
   72%
In software engineering the design phase is divided into( )。
   题号导航      2019年下半年 信息系统监理师 上午试卷 综合知识   本试卷我的完整做题情况  
1 /
2 /
3 /
4 /
5 /
6 /
7 /
8 /
9 /
10 /
11 /
12 /
13 /
14 /
15 /
 
16 /
17 /
18 /
19 /
20 /
21 /
22 /
23 /
24 /
25 /
26 /
27 /
28 /
29 /
30 /
 
31 /
32 /
33 /
34 /
35 /
36 /
37 /
38 /
39 /
40 /
41 /
42 /
43 /
44 /
45 /
 
46 /
47 /
48 /
49 /
50 /
51 /
52 /
53 /
54 /
55 /
56 /
57 /
58 /
59 /
60 /
 
61 /
62 /
63 /
64 /
65 /
66 /
67 /
68 /
69 /
70 /
71 /
72 /
73 /
74 /
75 /
 
第74题    在手机中做本题